We sincerely thank our voters for their continued support in approving over $105 million in essential capital improvements for our District. This section of our website has been created to promote transparency, provide clear communication, and celebrate the progress of our Capital Improvement Projects. Below, you’ll find detailed information about each project, including costs, timelines, and before-and-after photos.
Ginther Elementary School
• Boiler replacement
• Upgrade from pneumatic (air) to HVAC digital controls
• Air conditioning in the cafeteria
• Classroom reconstruction
Barclay Elementary School
• Improve heating and ventilation
• HVAC digital controls
• Air conditioning in the cafeteria
Hill Elementary School
• Boiler replacement
• Upgrade from pneumatic (air) to HVAC digital controls
• Air conditioning in the band room and nurses office
• Provide ventilation in corridors
• LED replacement at existing light poles
Oliver Middle School
• Upgrade from pneumatic (air) to HVAC digital controls
• Air conditioning in band room
• Roof reconstruction
• Provide ventilation in corridors
• Perimeter drain and foundation waterproofing
• Replace sidewalks along new drain
• Modernize and repair elevator
Brockport High School
• Repair exterior concrete columns and sills
• Upgrade from pneumatic (air) to HVAC digital controls
• Roof reconstruction
• Pool repairs (drains/shell)
• Pool shower fixture replacement
• Potable water piping replacement
• Modernize and repair elevator
• Fire alarm panel
Ginther Elementary School
Barclay Elementary School
Hill Elementary School
Oliver Middle School
Brockport High School
Ginther Elementary School
Barclay Elementary School
Hill Elementary School
Oliver Middle School
Brockport High School
Technology and Training Center
Grounds/Maintenance Buildings
For additional information:
Links
Downloads
For additional questions or information, contact our Business office at (585) 637-1820.