Ginther School
Improvements and Updates
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
Boiler Replacement |
![]() |
![]() |
||
Upgrade from pneumatic (air) to HVAC digital controls | ![]() |
|||
Air conditioning in the cafeteria |
||||
Classroom Reconstruction |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
Kitchen Reconstruction |
May 2026 | September 2026 | ![]() |
|
Cafeteria Finishes | May 2026 | September 2026 | ![]() |
|
Classroom Renovations: Sinks/ Cabinets/Toilet Rooms | June 2026 | August 2026 |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
LED Lighting Upgrades (energy-savings) |
-
Area Est. Start Est. End Current Pictures After/Renderings Boiler Replacement
Upgrade from pneumatic (air) to HVAC digital controls Air conditioning in the cafeteria
Classroom Reconstruction -
Area Est. Start Est. End Current Pictures After/Renderings Kitchen Reconstruction
May 2026 September 2026 Cafeteria Finishes May 2026 September 2026 Classroom Renovations: Sinks/ Cabinets/Toilet Rooms June 2026 August 2026 -
Area Est. Start Est. End Current Pictures After/Renderings LED Lighting Upgrades (energy-savings)