Brockport High School
Area |
Est. Start | Est. End |
Current Pictures |
After/Renderings |
Repair exterior concrete columns and sills |
||||
Upgrade from pneumatic (air) to HVAC digital controls | ||||
Roof reconstruction | ||||
Pool repairs (drains/shell) | ||||
Pool shower fixture replacement | ||||
Potable water piping replacement | ||||
Modernize and repair elevator | ||||
Fire alarm panel |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
Site Drainage Reconstruction |
June 2025 | August 2025 | ||
Site Fiber Line - Bury Overhead Line | June 2025 | August 2025 | ||
Site Baseball/Softball Fencing - Backstops - Drainage | June 2025 | August 2025 | ||
Toilet Room Renovations | June 2025 | August 2025 | ||
Roof Reconstruction | June 2025 | August 2025 |
Area | Est. Start | Est. End | Current Pictures | After/Renderings |
District Pool Replacement |
![]() |
|||
New Team Rooms Wrestling Room with Performing Arts and Custodial Storage | ![]() |
|||
Sanitation Lift Station Replacement | ||||
East Parking Lot Reconfiguration | ![]() |
-
Area
Est. Start Est. End Current Pictures
After/Renderings
Repair exterior concrete columns and sills
Upgrade from pneumatic (air) to HVAC digital controls Roof reconstruction Pool repairs (drains/shell) Pool shower fixture replacement Potable water piping replacement Modernize and repair elevator Fire alarm panel -
Area Est. Start Est. End Current Pictures After/Renderings Site Drainage Reconstruction
June 2025 August 2025 Site Fiber Line - Bury Overhead Line June 2025 August 2025 Site Baseball/Softball Fencing - Backstops - Drainage June 2025 August 2025 Toilet Room Renovations June 2025 August 2025 Roof Reconstruction June 2025 August 2025 -
Area Est. Start Est. End Current Pictures After/Renderings District Pool Replacement
New Team Rooms Wrestling Room with Performing Arts and Custodial Storage Sanitation Lift Station Replacement East Parking Lot Reconfiguration